Site Acceptance Test (SAT) Checklist

Use this checklist to verify a control system on site after installation and before handover. Adapt it to your project. Ticks and notes are saved on this device.

1. Before you start

2. Installation verification

3. Pre-power checks

4. Field devices and loops

5. Controls and communications

6. Functional testing

7. Performance and run test

8. Safety verification

9. Handover

Notes and punch list